To prepare for fence installation, mark the property line, clear a 3 to 5 foot work zone along the fence path, call 811 to locate buried utilities, remove obstacles like old fence or landscape features, and confirm the crew can access the yard with equipment. A day of prep on your side saves the crew hours on install day and helps ensure the finished fence lands where you want it.
At Fence Company of Columbus, installs go smoothest when the homeowner has done a bit of prep work before the crew arrives. Here is the checklist we walk clients through in the week before install day.
The 2 week window is for the paperwork side. Two things to handle:
The week before install is for the practical prep. Three things:
Final prep is short but important:
Ohio's 811 system is the free public service that dispatches utility technicians to mark buried lines before any digging project. It is legally required for excavation work in Ohio, including fence post holes.
Call at least 3 business days before the fence work starts. Utilities have that window to send technicians. The markings usually last 10 to 14 days before they need to be refreshed. Time the call so the marks are still visible on install day.
The most common issues we see on install day are 811 calls that were skipped entirely (leaves the crew unable to dig safely) and 811 calls that were made too early (marks have faded and need to be redone).
If the fence runs along a shared property line, tell the neighbor before install day. A brief conversation prevents surprises and lets the neighbor plan around any noise, blocked driveway access, or workers on their side of the line.
Most neighbors appreciate the heads up. Some may want to share cost if the fence benefits both properties. Have the specific plan (height, material, timing) ready when you talk to them.
Do I need to remove my old fence myself?
Usually no. The contractor typically handles old fence removal as part of the project scope. Confirm this in the quote before install day.
What if the yard is fully landscaped?
Landscape complexity is manageable. The crew will work around plants and beds as much as possible, but any items directly in the post line may need to be moved. Discuss specific items with the crew in advance.
Do I need to be home during install?
Not required for most residential installs. If the property line has any ambiguity, being home for at least the initial post layout is helpful. Otherwise the crew works from the marked plan.
How much yard access does the crew need?
A gate opening at least 3 feet wide is typically enough for hand-carried materials. For larger projects with mechanical post-hole diggers, the crew may need a wider access path (5 to 6 feet). Confirm access details in advance.
At Fence Company of Columbus, we send a pre-install checklist to every client before install day so nothing gets missed on your side, and the crew arrives to a site that is ready for the actual fence work rather than prep work.